推荐星级:
  • 1
  • 2
  • 3
  • 4
  • 5

VTO_2018_APR_ELECTRIFICATION

更新时间:2019-06-29 13:41:37 大小:46M 上传用户:ZAQWERSS查看TA发布的资源 标签:vto_2018_apr_electrification 下载积分:5分 评价赚积分 (如何评价?) 打赏 收藏 评论(0) 举报

资料介绍

During fiscal year 2018 (FY 2018), the U.S. Department of Energy (DOE) Vehicle Technologies Office
(VTO) funded early stage research & development (R&D) projects that address batteries and electrification of
the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive
Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects
that advance electric motors and power electronics technologies. The Grid and Charging Infrastructure group
conducts R&D projects that advance grid modernization and electric vehicle charging technologies. This
document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D
projects. Each of the progress reports provide a project overview and highlights of the technical results that
were accomplished in FY 2018.

部分文件列表

文件名 大小
VTO_2018_APR_ELECTRIFICATION_040219_compliant.pdf 46M

全部评论(0)

暂无评论

上传资源 上传优质资源有赏金

  • 打赏
  • 30日榜单

推荐下载